  •  Double Lanning of railway line onFarkka Barrage. Approximately 1.3 Km long Bridge with Pre-stressed Concrete Girders launched in position using specially designed gantries and insitu Cast RCC Slab.

 

  • • 100m Long Pre-stressed concrete cantilever Construction Bridge over deep Gorge at Doda in jammu.

 

  • 135 m Long Pre-stressed concrete cantilever Construction Bridge over chenab -Ganpat bridge.

 

  • 50X2 - PSC Box section bridge well foundations at Rehal Jammu. 

 

  • Sivadal Bridge at Doda with 2 span contineous bridge with 90m. and 40m. spans in steel. 

 

  • Chajjala bridge - 35X3 spans with open foundations using steel concrete composite construction. 

 

  • Datyal Bridge at Akhnoor 1.3 Km. long multispan PSC box sections.

 

  • Raw-water  pipe cum vehicular bridge 1.1 Km. long at Swai Madhopur Rajasthan.

 

  • Transmission Line Tower Foundation crossing Yamuna River in Delhi Comprising of Well foundation for  interior spans and pile foundation for anchor spans

 

  • • Transmission line foundation for 105 m Tall transmission line towers crossing Vashi Creek in Bombay along with tower foundation in Marshy tidal areas.

•

  • Bagdora Airport Terminal Building – Modern terminal building with all high tech facilities for Arrival & Departure areas.

    •

  • Control Tower for Lila Bari AirPort. Sleek slender Structure . Dental Block & Special wards for LNJP Hospital Delhi.

 

  • Terminal T3 Delhi Car Parking 